Background illustration: Aerial view of a California-style home with rooftop solar panels

Electrical · Solar · Battery

Solar Panel Installation in Citrus Heights

Solar for Citrus Heights homes on SMUD, planned around how much power your house actually uses. Our crew pulls the permit with the City of Citrus Heights, wires the system into your panel, and takes care of the SMUD paperwork to get it turned on. You deal with one local electrician the whole way through.

Get a free estimate

Request a callback during business hours.Fields marked with an asterisk are required.

No obligation. We use your details only to respond. Privacy

C-10 #1141678 Licensed & insuredOur own crewPermits handled

“I'd highly recommend Under The Sun for your solar needs. I recently had 10 additional panels added to boost the production of my existing system. …”

Michael Keller · Google review

Our standards. Our customers’ words.

Feel confident about who’s working on your home.

Electrical, solar, and battery work for Citrus Heights homes, handled by our own licensed crew.

CSLB C-10 #1141678California electrical contractor · Insured
Verify our license with the CSLB
A clear scope
Know what the job includes and what it costs before you commit.
Handled through completion
Our crew coordinates required permits and inspections, tests the work, and walks you through the result.

A customer’s project

More solar, with a clean finish

Expand an existing solar system with 10 additional panels.

The customer reported the installation was completed in one day, without exposed conduit.

I'd highly recommend Under The Sun for your solar needs. I recently had 10 additional panels added to boost the production of my existing system. Mark and Paul were very responsive and easy to work with. They also worked with me to ensure a clean installation making sure no ugly conduit was exposed and completed the entire install process in a single day. …

Michael KellerSolar expansion · Google review
Close view of a residential rooftop solar array
Why homeowners go solar

Lower bills and protection from rate hikes · Produce and store your own electricity · Plan for EV charging and future electrical loads · Pair solar with battery backup for selected circuits

Solar panel installation in Citrus Heights

Your roof, electricity use, and panel capacity shape the solar design. We plan the array and electrical connection together, with required permits and utility interconnection included in the scope.

  • Custom solar design and installation
  • Roof or ground-mounted systems
  • Inverter selection and electrical connection
  • Panel capacity and wiring checks
  • Permit and utility interconnection coordination
  • Solar and battery planning together
Get a free estimate

Built around what you need

The right setup for Citrus Heights homes.

Tell us what you want to change. We’ll check the details and give you a clear scope.

California-style home with a broad roof and landscaped entrance

A roof & usage-based solar plan

Your roof space, electricity use, and future appliances shape the design. Bring a recent utility bill to the estimate conversation.

Ask about this
Enclosed exterior electrical panel and utility meter

Electrical connection handled

Panel capacity, wiring routes, permits, and utility coordination belong in the same scope as the rooftop installation.

Ask about this
Enclosed home battery and gateway on an exterior wall

Add battery backup to the conversation

Want power during outages? Discuss storage early so the solar and backup equipment can be planned together.

Ask about this
Have a project in mind?Get a free estimate. No obligation.

Before you decide

What goes into your Citrus Heights project.

The right scope starts with your existing equipment and what you want to change.

Design from your usage and existing equipment

We review roof space, shading, electrical service, and electricity use before sizing solar panels for a Citrus Heights home. An EV charger or future electric appliance can affect that plan. For an existing system, panel additions and battery storage begin with an inverter and connection compatibility check.

SMUD connection and the installation sequence

The project includes the applicable City of Citrus Heights permit, inspection, and SMUD interconnection requirements. Any HOA review is considered where relevant to the property. We put equipment and electrical work in the estimate; savings, incentives, and operating dates depend on the actual system and current program requirements.

A clear plan, start to finish

From the first call to the final walkthrough.

  1. Call or request service

    Tell us what is going on. We will ask a few questions and set a time to look at it.

  2. Inspection and load check

    We test the circuit or panel and check capacity before recommending anything.

  3. Written scope and price

    You see exactly what we will do and what it costs before work starts. We handle the permits.

  4. Install, inspect, walk through

    Clean installation, testing, and the final city inspection. We show you what was done.

Questions about solar panel installation

Something else? Call or text (916) 899-3062.

Do I need a permit to install solar panels in Citrus Heights?

Yes. A building permit from the City of Citrus Heights and interconnection approval from SMUD are both required before your system can legally operate and connect to the grid. Under the Sun Electric handles all permitting in-house as a standard part of every installation — you don't need to deal with the city or utility directly.

How does SMUD's Solar and Storage Rate affect my savings?

Under SMUD’s Solar and Storage Rate, exported electricity is credited at 9.6 cents per kWh as of June 1, 2026. We look at when you use electricity, what the array would export, and whether storing power helps your household.

How long does a solar installation take from start to finish?

From signed proposal to system activation, most Citrus Heights solar projects take 6–12 weeks. The installation itself is typically 1–2 days, but permitting, inspection scheduling, and SMUD interconnection approval account for most of the timeline. We keep you informed at every stage and manage the process end-to-end.

What happens to my solar system during a power outage?

A standard grid-tied solar system without battery storage will shut down automatically during a grid outage — this is a safety requirement to protect utility workers. If backup power during outages is a priority for you, we recommend adding a battery storage system, which can keep critical circuits running when the grid goes down.

Does my roof need to be replaced before I install solar?

It depends on your roof's current condition and remaining lifespan. Solar panels are typically warrantied for 25 years, so installing them on a roof that's nearing the end of its life can create headaches down the road when the roof needs to be replaced and panels must be removed and reinstalled. We assess your roof as part of our initial consultation and will let you know honestly if we recommend re-roofing first.

What solar panel brands do you install?

We install panels from leading manufacturers known for efficiency, durability, and strong warranty terms — the brands we recommend vary based on system design and budget, and we'll walk you through the options during your proposal. All panels we install carry manufacturer product and performance warranties of at least 25 years.

Let’s talk about your project

Get a free estimate in Citrus Heights

Call or text for the fastest answer, or send a request and we will call you back during business hours.

CallFree estimate