Background illustration: Electric car and wall-mounted home charger in a garage

Electrical · Solar · Battery

EV charger installation Roseville

Home EV charger installation in Roseville, including Tesla Wall Connector and other Level 2 chargers. Our licensed crew checks panel capacity, plans the charging circuit, and handles required permits.

Get a free estimate

Request a callback during business hours.Fields marked with an asterisk are required.

No obligation. We use your details only to respond. Privacy

C-10 #1141678 Licensed & insuredOur own crewPermits handled

“Great experience with Under the Sun Solar and Electric! They did an excellent job installing my Tesla Wall Connector. …”

Bunny Bun · Google review

Our standards. Our customers’ words.

Feel confident about who’s working on your home.

Electrical, solar, and battery work for Roseville homes, handled by our own licensed crew.

CSLB C-10 #1141678California electrical contractor · Insured
Verify our license with the CSLB
A clear scope
Know what the job includes and what it costs before you commit.
Handled through completion
Our crew coordinates required permits and inspections, tests the work, and walks you through the result.

A customer’s project

Level 2 charging, ready at home

Install a Tesla Wall Connector for home charging.

The customer reported a clean installation, completed on time, with the charger working properly.

Under the Sun Solar and Electric did an excellent job installing my Tesla Wall Connector Level 2. The installation was clean, professional, and completed on time, and everything works perfectly. Great communication and fair pricing — highly recommend them for Tesla charger installation in Sacramento.

Ivanna SorokaLevel 2 EV charger · Google review
Wall-mounted home EV charger with neatly stored charging cable
Sound familiar?

“My portable charger is too slow.” · “I keep tripping a breaker when charging.” · “I’m buying a Tesla and need a charger first.” · “We want to charge two EVs at once.” · “The electrician I called couldn’t handle the panel upgrade.”

Home EV charger installation in Roseville

A Level 2 charging setup starts with where you park and what your panel can support. One crew handles the charger, dedicated circuit, and any panel work the load calculation calls for.

  • Load evaluation and a charger placement plan
  • Breakers and wiring sized correctly
  • Panel upgrade when the load calls for it
  • Clean conduit runs, inside or out
  • Permit and inspection sign-off
  • A walkthrough on using your charger

Chargers we install

Tesla Wall Connector · ChargePoint Home Flex · Wallbox Pulsar Plus · JuiceBox · Other Level 2 chargers

Get a free estimate

Built around what you need

The right setup for Roseville homes.

Tell us what you want to change. We’ll check the details and give you a clear scope.

Charging connector plugged into an electric vehicle at home

Tesla Wall Connector installation

A home charging setup planned around where you park. We install Tesla Wall Connector, ChargePoint, Wallbox, and other Level 2 chargers, with cable reach and electrical capacity checked first.

Ask about this
Residential electrical panel with enclosed breakers

Panel capacity checked first

We check the available load before recommending panel work. You may be able to install a charger with your existing service.

Ask about this
Electrical testing equipment and insulated tools

A correctly sized charging circuit

The charger, breaker, and wiring need to work together. Our scope includes the circuit, required permits, testing, and a walkthrough.

Ask about this
Have a project in mind?Get a free estimate. No obligation.

Before you decide

What goes into your Roseville project.

The right scope starts with your existing equipment and what you want to change.

Choose the connection that suits your routine

A Level 2 charger provides a different charging experience from a standard 120-volt outlet. We review your vehicle, daily driving, and parking location before recommending a Tesla Wall Connector or another compatible charger. Garage and outdoor installations are planned around cable reach, equipment ratings, and the circuit route.

Check the panel before adding a charging circuit

For Roseville homes, we review available capacity and breaker space alongside household loads. A charger does not automatically require a service upgrade. We explain the circuit design and any panel work in the estimate, then handle the required local permit and utility coordination for the agreed scope.

A clear plan, start to finish

From the first call to the final walkthrough.

  1. Call or request service

    Tell us what is going on. We will ask a few questions and set a time to look at it.

  2. Inspection and load check

    We test the circuit or panel and check capacity before recommending anything.

  3. Written scope and price

    You see exactly what we will do and what it costs before work starts. We handle the permits.

  4. Install, inspect, walk through

    Clean installation, testing, and the final city inspection. We show you what was done.

Questions about EV charger installation

Something else? Call or text (916) 899-3062.

What does EV charger installation cost in Roseville, CA?

The price depends on the charger, the distance from the panel to the parking spot, the dedicated 240V circuit, and the permit. If your panel needs an upgrade to handle the additional load, that is part of the quote too. We give you a written quote after a free on-site visit. Call 916-899-3062 or → request yours here — no obligation.

Do I need a permit to install an EV charger in Roseville?

Yes — City of Roseville requires a building permit for Level 2 EV charger installations. The city has a streamlined, expedited permitting process specifically for EV charging stations under California Government Code Section 65850.7, which typically means faster turnaround than standard electrical permits. We handle the entire permit process as part of every installation — you don't need to call the city or fill out any paperwork yourself.

How long does EV charger installation take?

The physical installation typically takes 2–4 hours for a standard garage setup. If we're also upgrading your panel, plan for a full day. Most projects in Roseville are scheduled within 1–2 weeks of your estimate — call sooner rather than later if you want to get on the calendar before the next wave of EV deliveries hits.

Which EV charger brands do you install?

We install all major residential EVSE brands — Tesla Wall Connector, ChargePoint Home Flex, Enel X JuiceBox, Emporia, Wallbox, and others. We're brand-neutral and will give you an honest recommendation based on your car, your panel, and how you actually use your vehicle — not based on which brand pays a commission.

Do I qualify for a rebate on EV charger installation in Roseville?

Possibly. Roseville Electric Utility offers rebates on Level 2 residential charger installations. If your home is in a part of Roseville served by SMUD, the SMUD Charge@Home program offers rebates as well. Federal tax credits (Form 8911) may also apply depending on your situation — we'd recommend checking with your tax advisor on that piece. Bring it up at your estimate and we'll help you figure out what you're eligible for. Call 916-899-3062 or → schedule your free estimate.

Let’s talk about your project

Get a free estimate in Roseville

Call or text for the fastest answer, or send a request and we will call you back during business hours.

CallFree estimate