
Tesla Wall Connector installation
A home charging setup planned around where you park. We install Tesla Wall Connector, ChargePoint, Wallbox, and other Level 2 chargers, with cable reach and electrical capacity checked first.
Ask about thisElectrical · Solar · Battery
Home EV charger installation in Elk Grove, including Tesla Wall Connector and other Level 2 chargers. Our licensed crew checks panel capacity, plans the charging circuit, and handles required permits.
Thanks. We will get back to you during business hours (Mon–Fri 8 AM–6 PM, Sat 9 AM–4 PM). If it is urgent, call or text (916) 899-3062.
“Great experience with Under the Sun Solar and Electric! They did an excellent job installing my Tesla Wall Connector. …”
Our standards. Our customers’ words.
Electrical, solar, and battery work for Elk Grove homes, handled by our own licensed crew.
A customer’s project
Install a Tesla Wall Connector for home charging.
The customer reported a clean installation, completed on time, with the charger working properly.
Under the Sun Solar and Electric did an excellent job installing my Tesla Wall Connector Level 2. The installation was clean, professional, and completed on time, and everything works perfectly. Great communication and fair pricing — highly recommend them for Tesla charger installation in Sacramento.

“My portable charger is too slow.” · “I keep tripping a breaker when charging.” · “I’m buying a Tesla and need a charger first.” · “We want to charge two EVs at once.” · “The electrician I called couldn’t handle the panel upgrade.”
A Level 2 charging setup starts with where you park and what your panel can support. One crew handles the charger, dedicated circuit, and any panel work the load calculation calls for.
Tesla Wall Connector · ChargePoint Home Flex · Wallbox Pulsar Plus · JuiceBox · Other Level 2 chargers
Built around what you need
Tell us what you want to change. We’ll check the details and give you a clear scope.
Before you decide
The right scope starts with your existing equipment and what you want to change.
We install Tesla Wall Connectors and other compatible Level 2 equipment in Elk Grove garages and outdoor parking areas. The plan covers the wiring route, cable reach, breaker, and mounting location. We check the existing service before deciding how much charging capacity the household can support.
City of Elk Grove permits and any applicable SMUD coordination are considered before work begins. If you have solar or expect another EV, tell us during the assessment so those loads can be reviewed together. Any rebate or rate option should be checked against the utility’s current requirements before it is included in your budget.
A clear plan, start to finish
Tell us what is going on. We will ask a few questions and set a time to look at it.
We test the circuit or panel and check capacity before recommending anything.
You see exactly what we will do and what it costs before work starts. We handle the permits.
Clean installation, testing, and the final city inspection. We show you what was done.
Something else? Call or text (916) 899-3062.
The price depends on the dedicated circuit, mounting, permit, and testing. A short run from a panel with open capacity costs less; a long conduit route across the garage, a subpanel, or a service upgrade costs more. We give you a written quote after a free load check.
Yes. Elk Grove is served by SMUD, which offers residential EV charger rebates and EV-specific time-of-use rates that lower both the install cost and your ongoing charging cost. Program details and dollar amounts change from year to year, so we confirm the current SMUD offer during your estimate and help you file the paperwork. Call 916-899-3062 and we will check what you qualify for.
Yes. A new 240V circuit for an EV charger requires an electrical permit from the City of Elk Grove, and skipping it can create problems at resale or with your insurer. We handle the permit and the inspection as part of the job, so the finished install is fully documented and code-compliant.
Often yes. Homes built in the 1990s and 2000s across Laguna, Laguna West, and Stonelake typically have 150 to 200 amp service, which is frequently enough for a Level 2 charger. The only way to be sure is a load calculation, which we run for free before recommending anything. If the numbers are tight, load management or a panel upgrade keeps you safe and code-compliant.
A typical Level 2 install is a half-day to a full day once the permit is in hand. Straightforward runs go quickest; panel upgrades or long conduit routes add time. We give you a realistic schedule up front so you can plan around it. Ready to book? Call 916-899-3062 or request a free estimate.
Let’s talk about your project
Call or text for the fastest answer, or send a request and we will call you back during business hours.